Buscar productos

costonet

Clave
Descripción
Unidad
Precio
SISTEMA DE PRECIOS UNITARIOS NEWWALL Y BASE DE DATOS COSTONET CON 4,000 ANALISIS Y SUS RESPECTIVOS MATERIALES DE CONSTRUCCION
PZA
3,434.15
BASE DE DATOS COSTONET CON 4,000 ANALISIS Y SUS RESPECTIVOS MATERIALES DE CONSTRUCCION
PZA
3,267.24
TEE REDUCIDA FIERRO FUNDIDO BRIDADA 457 X 102 MM (18" X 4")
PZA
23,031.09
CONCRETO PREMEZCLADO F'C=250 KG/CM2 RESISTENCIA NORMAL AGREGADO MAXIMO 1 1/2" (A)
M3
2,509.94
FINNOPLAST RECUBRIMIENTO PARA INT. Y EXT. FINNOPLAST19
LT
95.58
VIGA IPR (TODAS LAS MEDIDAS)
KG.
18.60
PIEDRA BRASA
M3
254.73
VARILLA No. 3 (3/8")
KG.
21.63
PERFIL TUBULAR PINTADO C150 CALIBRE 18
KG.
48.34
CONCRETO PREMEZCLADO F'C=200 KG/CM2 RESISTENCIA NORMAL AGREGADO MAXIMO 3/4" (A)
M3
2,021.17
PTR GALVANIZADO DE 2" X 2" CAL. 14 X 6 MTS LGO
PZA
615.76
TEPETATE
M3
123.74
GRAVA DE 3/4"
M3
279.70
MADERA DE PINO (TABLA) DE 3A DE 1" X 4" X 8 1/4' (2.75')
PZA
61.35
ASFALTO FM-1 PAVIMENTO Y RIEGO ASFALTICO APLICADO
LT
18.96
MADERA DE PINO (TABLON) DE 1A DE 2" X 12" X 8 1/4' (16.5')
PZA
843.44
ALAMBRE RECOCIDO No. 18
KG
38.31
ARENA
M3
247.39
VARILLA No. 2.5 (5/16")
KG.
30.66
CONCRETO PREMEZCLADO F'C=100 KG/CM2 RESISTENCIA NORMAL AGREGADO MAXIMO 1 1/2" (A)
M3